Built for developers, contractors, and design teams.

If you're underwriting a LIHTC acquisition-rehab in Washington, 4% or 9%, the Qualified Allocation Plan (QAP) decides a lot about your scope and your budget, often before you've made an offer. This guide lays out what the Washington State Housing Finance Commission (WSHFC) expects of a rehab, and where the real money hides.

True Craft is licensed in 24 states and counting, and LIHTC rehab is all we do. We read the current WSHFC policies against your specific building so a requirement never blindsides your budget.

Get your Washington property scored →

Washington quick facts

  • Agency: WSHFC (also the state’s main multifamily bond issuer)
  • Programs: 9% competitive with geographic credit pools; 4% under the Bond/Tax Credit Program Policies
  • Governing rules: 2026 Washington QAP + 9% and Bond/Tax Credit policy documents (WAC 262-01)
  • Standards: Evergreen Sustainable Development Standard v4.1 (mandatory) + rehab addendum and CNA
  • Accessibility: Fair Housing · ADA · Section 504
  • Typical timeline: 6–9 months to bid
The basics

What WSHFC counts as “rehabilitation.”

Washington runs rehab through a required Capital Needs Assessment and rehab addendum, and classifies scope as moderate or substantial/gut. The classification matters: moderate rehabs must score 40 optional points under the Evergreen Standard, while substantial and gut rehabs are held to the new-construction bar of 50.

There's no flat per-unit dollar minimum — the 9% policies tie the rehab threshold to a percentage of the building's as-is value — but between Evergreen and one of the country's most stringent energy codes, Washington scopes trend deep.

Before you bid

The Washington cost-drivers worth pricing early.

These are the requirements that most often move a Washington rehab budget. Not all apply to every deal. The skill is knowing which land on yours.

  • Accessibility & Section 504

    Fair Housing, ADA, and, when federal money is in the stack, Section 504. The Evergreen Standard adds universal-design and accessibility criteria among its scored measures.

    FHA · ADA · 504
  • Evergreen Standard on rehab

    ESDS v4.1 compliance is non-negotiable on every WSHFC deal, and even moderate rehabs must hit 40 optional points on top of the mandatory measures — green materials, ventilation, and water scope included.

    ESDS v4.1
  • Washington State Energy Code

    WSEC is among the most stringent energy codes in the country, so substantial alterations can trigger envelope, heat-pump, and ventilation upgrades well beyond the original scope.

    WSEC
  • Seismic retrofit exposure

    Older Puget Sound-area buildings often need seismic work during major rehab. WSHFC treats seismic retrofit as an extraordinary circumstance that can justify exceeding its total development cost limits.

    WSHFC TDC policy
  • Tenants in place & relocation

    Most Washington rehabs are occupied. Relocation logistics, phasing, and temporary-relocation costs belong in the budget and the schedule from day one.

    URA / relocation
  • Scope & cost certainty

    A Property Condition Assessment grounds the scope; how tightly it's defined drives how much contingency risk rides in your bid.

    PCA · SOW
How we help

We turn the Washington QAP into one number.

Every property we assess gets a True Craft Score: a 0–100 read on how ready and how risky it is as a rehab, with the Washington-specific cost-drivers above flagged green, amber, or red. You walk into the bid knowing exactly where the risk is.

See how the True Craft Score works →

Why True Craft
  • Licensed in 24 states and counting
  • 4,400+ units rehabbed or in progress nationwide
  • 100% of completed projects on time and on budget
  • Direct experience with HUD and two dozen state housing agencies
FAQ

Washington LIHTC rehab: common questions.

Who administers LIHTC in Washington?

The Washington State Housing Finance Commission (WSHFC) administers both programs: the 9% credit through an annual competitive round under its QAP and 9% policies, and the 4% credit through its Bond/Tax Credit Program Policies. WSHFC is also the state's primary conduit bond issuer, so most 4% deals are financed and allocated by the same agency.

Is there a minimum rehab spend in Washington?

Not a flat dollar figure — the 9% policies set a rehab threshold tied to a percentage of the building's as-is value, and every rehab needs a Capital Needs Assessment and rehab addendum. The Evergreen Standard then sets much of what the scope must contain.

What is the Evergreen Standard, and does it apply to rehab?

The Evergreen Sustainable Development Standard (currently v4.1) is Washington's mandatory green building standard for all WSHFC LIHTC projects. Moderate rehabs must meet all applicable mandatory measures plus 40 optional-criteria points; substantial and gut rehabs are held to the new-construction threshold of 50.

How fast can you get us to the bid table?

With a clear scope, typically 6–9 months from first call.

Note: This guide is for orientation, not legal or tax advice. The QAP and design standards change every year. On your deal, we always work from the live, current version. Sources: WSHFC 2026 QAP, the 9% Competitive and Bond/Tax Credit Program Policies, and the Evergreen Sustainable Development Standard v4.1.